Place of Origin: | China |
Brand Name: | KYE |
Certification: | ISO9001:ISO14001 |
Model Number: | OEM |
Minimum Order Quantity: | 1 set |
---|---|
Price: | To Be Negotiation |
Packaging Details: | Wooden Case With Steel Frame |
Delivery Time: | 30-50 working days |
Payment Terms: | T/T |
Supply Ability: | 50 Sets Mould Per Month |
Part Mateiral: | A380/ADC12/A356/ADC12 | Mold Type: | 2 Plate-mold |
---|---|---|---|
Useage: | Movable Table Lamp Lock | Mold Material: | 1.2344/H13/738H |
Mold Base Material: | S50C LKM, DME, LKM & HASCO & DME, HASCO, LKM Mould Base | Part Surface: | Texture, High Gloss Polishing,powder Coating,laser Cutting,Chrome,electro-plating |
Highlight: | HASCO Die Casting Mold,1.2344 HASCO Mold,2 plate HASCO Mold |
Aluminum Accessories 1.2344 HASCO Die Casting Mold
Product Details Description
Plastic materials | Aluminum A380/ADC12/A356/ADC12, zinc...Metal...etc. |
Quality | ROSH and SGS standard |
Size | According to your drawing |
Mould Base | S50C HASCO standard, European standard, World standard |
Mould Base Material | LKM, FUTA, HASCO, DME, etc. or as per customer’s requirement. |
Surface Finishing | Texture (MT standard), high gloss polishing |
Cavity / Core material | P20, 2311, H13, 2344, Starvax 420, 236,AdC3, S136, 2312, 2379, 2316, 2083, Nak80, 2767 etc. |
Cavity Number | Single cavity, Muti Cavity, based on customer’s requirement. |
Design & Program Softwares | CAD, CAM, CAE, Pro-E, Solid works…etc. |
Mold building lead time | 30~50 days after mold 3D approved, parts measurement report (upon required). |
Annual production | 300-400 sets of mold |
Quality | ROSH and SGS standard |
Size | According to your drawing |
Mould Base | S50C HASCO standard, European standard, World standard |
Mould Base Material | LKM, FUTA, HASCO, DME, etc. or as per customer’s requirement. |
Surface Finishing | Texture, high gloss polishing,powder coating,laser cutting, Chrome, electro-plating |
Cavity / Core material | P20, 2311, H13, 2344, Starvax 420, 236,AdC3, S136, 2312, 2379, 2316, 2083, Nak80, 2767 etc. |
Cavity Number | Single cavity, Muti Cavity, based on customer’s requirement. |
Design & Program Softwares | CAD, CAM, CAE, Pro-E, Solid works…etc. |
Mold building lead time | 30~50 days after mold 3D approved, parts measurement report (upon required). |
Annual production | 300-400 sets of mold |
Founded in 2009, KYE Mold is located in Chang`an Dong Guan-high quality plastic mold and molding product center. We are near to Shen Zhen City, half an hour to Shen Zhen National Airport. We provide customer with one–stop service including product design,mold fabrication and second-processing(spray painting,printing,chrome,engrave and assembling).
KYE always keep perfect quality,best service and customer-first as our company-running theory as a result of winning big international market covering USA,Germany,UK,Italy,Australia,Middle-east ,South–east Asia and North Africa etc.
What we can offer
1. Engineering/ Technical
Mold design
Mold flow analysis
Project management
Supplier Managed Inventory
Design for Manufacturing
Value Analysis
2. Mold Build
Mold up range from 50KG to 10 tons
Complex Surfaces
Assembly Fixtures
Hot-Runner Capability
3. Technical Injection Molding
Structural Foam
Small Precision and Large Cosmetic
High Pressure Thin wall
FQA
Q: Are you trading company or factory?
A: We are factory.
Q. My components have already been developed on CAD. Can you use the drawings?
A. Yes! DWG, DXF, IGES, Solidworks and Rhino files can all be used to generate quotes, models and mould tools - this can save time and money in producing your parts.
Q. Can I test my idea/component before committing to mould tool manufacture?
A. Yes, we can use CAD drawings to make models for design and functional evaluations.
Q. What type of plastic is best for my design/component?
A. Materials selection depends on the application of your design and the environment in which it will function. We will be happy to discuss the alternatives and suggest the best material.
Q. What type of mould tool do I need?
A. Mould tools can be either single cavity (one part at a time) or multi-cavity (2, 4, 8 or 16 parts at a time). Single cavity tools are generally used for small quantities, up to 10, 000 parts per year whereas multi-cavity tools are for larger quantities. We can look at your projected annual requirements and recommend which would be best for you.
Q. Ok, I've decided to go ahead with my project. How long will it take to get my parts?
A. It can take 3-6 weeks to have the mould tool manufactured depending on the part's complexity and the number of impressions (single or multi). After we have received final approval by you of the new tool, you can expect delivery of parts within 3-5 days.
If you want to have your product to reverse manufacture,we can help you with our rich manufacturing experience.
If your current supplier is becoming cost prohibitive,we can help you to find a cost effective solution.
You can send samples, and we can design, manufacturer and ship a finished product to you.
Looking for the inquiry from you.
Contact Person: Mr. jeff
Tel: 0086 139 2681 9972
Fax: 86-769-8162-3892
DME Standard S50C LKM 718H Custom Injection Mold Maker
V0 PC Fire Protection Cold Runner OEM DMEElectronic injection Mould
500000 Shots 65A TPE Resin DME HASCO Insert Mould