Place of Origin: | China |
Brand Name: | KYE |
Certification: | ISO9001:ISO14001 |
Model Number: | 2 plate-mold |
Minimum Order Quantity: | 1 set |
---|---|
Price: | To Be Negotiation |
Packaging Details: | Artificial Wooden Box with Steel Frame |
Delivery Time: | 30 working days |
Payment Terms: | T/T |
Supply Ability: | 30 Sets Mould Per Month |
Product Material: | ABS PC, PMMA, POM, PVC,PA,HIPS,PE,PP, PC/ABS,TPU Etc. As Per Customer Request | Mold Material: | P20, 2311, H13, 2344, Starvax 420, 236, AdC3, S136, 2312, 2379, 2316, 2083, Nak80, 2767.etc. |
---|---|---|---|
Mold Base Material: | S50C LKM, DME, LKM & HASCO & DME, HASCO, LKM Mould Base | Cavity Number: | Single Cavity, Muti Cavity, Based On Customer’s Requirement. |
Mold Life: | 100,000-1,000,000 Shots | Design Software: | UG, PROE, CAD, CAD/ProE/UG/SOLIDWORKS, CATIA |
Surface: | EDM,VDI 3400 Code ,MOLD-TECH, Texturing,Cavity ,Core Finishing,High Polish, Mirror Face, Grade 3 Diamond, Paper Finish, Stone Finish. | Lead Time: | 30-50 Days T1 Upon The Mold 3D Approved |
High Light: | FUTA Electronic Injection Mold,100000 Shots Electronic Mold,Two Plate FUTA Electronic Mold |
100000 Shots Two Plate FUTA Electronic Injection Mold
Product Details Description
Plastic materials | PS, ABS, PP, PVC, PMMA, PBT, PC, POM, PA66, PBT+GF30%,Rubber, Silicone rubber, LSR, aluminum, zinc...Metal...etc. |
Quality | ROSH and SGS standard |
Size | According to your drawing |
Mould Base | S50C HASCO standard, European standard, World standard |
Mould Base Material | LKM, FUTA, HASCO, DME, etc. or as per customer’s requirement. |
Surface Finishing | Texture (MT standard), high gloss polishing |
Cavity / Core material | P20, 2311, H13, 2344, Starvax 420, 236,AdC3, S136, 2312, 2379, 2316, 2083, Nak80, 2767 etc. |
Cavity Number | Single cavity, Muti Cavity, based on customer’s requirement. |
Hot / Cold Runner | HUSKY, INCOE, YUDO, HASCO, DME, MoldMaster, Masterflow, Mastip,etc. |
Mould Life | 1,000 to 1,000,000 shots(according to your requirement) |
Design & Program Softwares | CAD, CAM, CAE, Pro-E, Solid works…etc. |
Package | Standard Artificial Wooden Box with Steel Frame |
Mold building lead time | 30~50 days after mold 3D approved, parts measurement report (upon required). |
Annual production | 300-400 sets of mold |
KYE Mould Technology Limited specialize in mold design, manufacture and product assembly since 2009. During the past decades, we served customers from worldwide by offering sustaining quality products and value-added services to help achieve customers’ success. Our professional industry knowledge, problem-shot experience, fast reaction services and low cost solutions strengthen customers’ competence in both end market acknowledgement and competitions.
What KYE can offer
KYE can help you realize an idea to real product.
- Product idea viability check
- Product engineering verification
- Engineering design
- Prototype
- Tooling and molding
- Order production
- Assembly and packaging
- Logistics and shipping
OUR ADVANTAGE
1. Owned mold making workshop
KYE has owned mold workshop with 2,000 squre meteres in house to make sure the high quality and lead time.
2. Professional Engineer team
10 year of full expereience in line of plastic mold and molding, their professional skill can offer you the best solution for the project and help you manage the project in the best effective way.
3. Various Service
Our service including Automotive parts, Home Appliance, Electronic and Medical parts with one stop service
including product design, mould fabrication and second processing,such as Spray painting,Printing, Chrome, Engrave and assembling,etc.
4. Injection molding workshop
KYE has around 40-50 sets of injection machine.
5. Thorough project management system
KYE has thorough project management system from sales team to engineer and worker team.
Project process
Quote
|
According to sample, drawing and specific requirement.
|
|||
Discussion
|
Mold material, price, payment, etc.
|
|||
Advance
|
Payment by proforma invoice.
|
|||
Product Design Checking
|
We check the product design. If some position is not perfect, or can not be done on the mould, we will send customer the report.
|
|||
Mold Tooling
|
We start to make mold after mold design confirmed.
|
|||
Mold Processing
|
Send report to customer once each week.
|
|||
Mold Testing
|
Send trial samples to customer for confirmation.
|
|||
Mold Modification
|
According to customer’s feedback.
|
|||
Delivery
|
Delivery by sea or air. The forwarder can be designated by your side.
|
FAQ
Q: Are you a factory or trading company?
A: KYE is a factory in Chang`an Dong Guan, Guang Dong of China,welcome to visit us.
Q: How can I get the quotation?
A: We will submit the quotation in 24 hours if getting detailed information during working days.In order to quote for you earlier, please provide us the following information together with your inquiry.
1) 3D Step of Files and 2D Drawings
2) Material requirement
3) Surface treatment
4) Quantity (per order/per month/annual)
5) Any special demands or requirements, such as packing, labels,delivery,etc.
Q: What are the main oversea markets of KYE?
A: Currently HMT regular oversea customers are from the US, the UK, Middle East, Germany, France and Australia etc.
Q: What is your monthly capacity of mold making?
Our capability is 30 sets-50 sets molds one month,however, it depends of different products.
KYE team is at your service offering professional expertise, flexibility and accuracy in assumed deadlines.We are able to offer the full range of service from mold designing, making, plastic part molding to printing, assembly, package, and shipping arrangement.Welcome your visit and looking for your inquiry.
Contact Person: Mr. jeff
Tel: 0086 139 2681 9972
Fax: 86-769-8162-3892
DME Standard S50C LKM 718H Custom Injection Mold Maker
V0 PC Fire Protection Cold Runner OEM DMEElectronic injection Mould
500000 Shots 65A TPE Resin DME HASCO Insert Mould