Place of Origin: | China |
Brand Name: | KYE |
Certification: | ISO9001:ISO14001 |
Model Number: | 2 plate-mold |
Minimum Order Quantity: | 1 set |
---|---|
Price: | To Be Negotiation |
Packaging Details: | Artificial Wooden Box with Steel Frame |
Delivery Time: | 30-50 working days |
Payment Terms: | T/T |
Supply Ability: | 30 Sets Mould Per Month |
Product Material: | FEP Resin | Mold Material: | H13 HRC48-52 |
---|---|---|---|
Mold Base: | S50C LKM, DME, LKM & HASCO & DME, HASCO, LKM Mould Base | Cavity Number: | 1*2 |
Surface Treatment: | Glossy Outside And Polishing Inside | Design Software: | UG, PROE, CAD, CAD/ProE/UG/SOLIDWORKS, CATIA |
Mold Life: | 1000/300,000/500,000/1,000,000 Shots | Lead Time: | T1 4-5 Weeks After Mold 3D Approved |
High Light: | H13 Thin Wall Injection Molding,HRC 48 52 Thin Wall Injection Molding,2 Plate H13 Injection Molding |
FEP Resin 2 Plate H13 HRC 48 52 Thin Wall Injection Molding with Electronic Heating
Project details
Mould standard | LKM |
Mould type | 2 plate-mould |
Mould base steel | S50C LKM, DME, LKM & HASCO & DME, HASCO, LKM Mould Base |
A/B plate steel | P20 |
Core/Caviry steel | H13 HRC48-52 |
Runner type | cold runner with electronic heating |
Gate type | sub-gate |
Cycle time | 15 S |
Mould life | 500,000 shots shots |
Payment term | T/T |
Package | Artificial Wooden Box with Steel Frame |
Deliverly date | 4-5 Weeks |
OUR ADVANTAGE
1. Owned mold making workshop
KYE has owned mold workshop with 2,000 squre meteres in house to make sure the high quality and lead time.
2. Professional Engineer team
11 year of full expereience in line of plastic mold and molding, their professional skill can offer you the best solution for the project and help you manage the project in the best effective way.
3. Various Service
Our service including Automotive parts, Home Appliance, Electronic and Medical parts with one stop service
including product design, mould fabrication and second processing,such as Spray painting,Printing, Chrome, Engrave and assembling,etc.
4. Injection molding workshop
KYE has around 40-50 sets of injection machine.
5. Thorough project management system
KYE has thorough project management system from sales team to engineer and worker team.
Brief introduction of service cooperation process
1. Customized Making
Per your drawings or samples, we can customize your mold.
Per your requirement, we can modify and design your parts structure to establish the overall 3D effect drawing. And per above 3D drawing, we can provide mold making quotation and product molding quotation to you to help you to do the entire costing analysis.
2.Mold development and processing
After the customer's rapid prototype or diagram file is confirmed, we enter the mold design and processing flow.
a. Material purchase: According to the estimated product quantity and product appearance structure and post-processing, select different mold materials and mold base. The quality of the products required by the customer with the least cost. No waste, high quality.
b. Mold processing: The company has advanced high-speed machining centers, wire cutting, precision spark machines, lathes, grinding machines, milling machines, drilling machines and other processing equipment. According to the product requirements, choose the appropriate processing method, and complete the assembly and test.
2. Mould test review
After trial of mold, according to mold test situation and test report and testing sample,we will discuss with customers to further verify product quality and requirements, and confirm samples.
3. Modification and improvement of the mold
According to the review report, improve the modification of the nuances of the mold. And re-testing and back-surface processing, etc., to achieve customer required quality and confirmation.
4. Injection Molding Processing
The company has a first-class injection molding machine, check the quality of the mold and adjust the appropriate process parameters, complete the product injection molding, inspection packaging. After removing the nozzle, the quality of the injection parts will be checked, the qualified semi-finished products will be packed, ready to transfer to the next process, and the unqualified products should be collected and recycled.
5. Surface treatment
6. Complete assembly
7. Delivery to customers.
FAQ
Q1. How long is the lead time for mold?
It depends on the mold’s size and complexity. Normally, the lead time is 25-35 days. If the molds are very simple and not in big size, we can work out with 15 days.
Q2. I have no 3D drawing, how should I start the new project?
You can provide us the sample, we will help you to scan the sample and finish the 3D drawing design.
Q3. Can I get discounts?
Yes, for big order, regular customer and frequent customers, we give reasonable discounts.
Q4. Before shipment, how to make sure the products quality?
We are specialized in high quality products. We have QC to inspect the products before each shipment. You can come to visit our factory or ask a third party for inspection. Or we can send you videos to show the production process.
KYE always keep perfect quality,best service and customer-first as our company-running theory as a result of winning big international market covering USA,Germany,UK,Italy,Australia,Middle-east ,South–east Asia and North Africa etc.
Welcome your visit and looking for your inquiry.
Contact Person: Mr. jeff
Tel: 0086 139 2681 9972
Fax: 86-769-8162-3892
DME Standard S50C LKM 718H Custom Injection Mold Maker
V0 PC Fire Protection Cold Runner OEM DMEElectronic injection Mould
500000 Shots 65A TPE Resin DME HASCO Insert Mould