Place of Origin: | China |
Brand Name: | KYE |
Certification: | ISO9001:ISO14001 |
Model Number: | OEM |
Minimum Order Quantity: | 1 set |
---|---|
Price: | To Be Negotiation |
Packaging Details: | Wooden Case With Steel Frame |
Delivery Time: | 30-50 working days |
Payment Terms: | T/T |
Supply Ability: | 50 Sets Mould Per Month |
Part Mateiral: | A380/ADC12/A356/ADC12 | Mold Type: | 2 Plate-mold |
---|---|---|---|
Useage: | Furniture Fittings | Mold Material: | 1.2344/H13/738H |
Mold Base Material: | S50C LKM, DME, LKM & HASCO & DME, HASCO, LKM Mould Base | Part Surface: | Texture, High Gloss Polishing,powder Coating,laser Cutting,Chrome,electro-plating |
High Light: | A3 Die Casting Mould,LKM A3 Die Casting Mould,Cold Runner LKM Mould |
Cold Runner LKM Aluminum Alloy A3 Die Casting Mould
Product Details Description
Plastic materials | Aluminum A380/ADC12/A356/ADC12, zinc...Metal...etc. |
Quality | ROSH and SGS standard |
Size | According to your drawing |
Mould Base | S50C HASCO standard, European standard, World standard |
Mould Base Material | LKM, FUTA, HASCO, DME, etc. or as per customer’s requirement. |
Surface Finishing | Texture (MT standard), high gloss polishing |
Cavity / Core material | P20, 2311, H13, 2344, Starvax 420, 236,AdC3, S136, 2312, 2379, 2316, 2083, Nak80, 2767 etc. |
Cavity Number | Single cavity, Muti Cavity, based on customer’s requirement. |
Design & Program Softwares | CAD, CAM, CAE, Pro-E, Solid works…etc. |
Mold building lead time | 30~50 days after mold 3D approved, parts measurement report (upon required). |
Annual production | 300-400 sets of mold |
Quality | ROSH and SGS standard |
Size | According to your drawing |
Mould Base | S50C HASCO standard, European standard, World standard |
Mould Base Material | LKM, FUTA, HASCO, DME, etc. or as per customer’s requirement. |
Surface Finishing | Texture, high gloss polishing,powder coating,laser cutting, Chrome, electro-plating |
Cavity / Core material | P20, 2311, H13, 2344, Starvax 420, 236,AdC3, S136, 2312, 2379, 2316, 2083, Nak80, 2767 etc. |
Cavity Number | Single cavity, Muti Cavity, based on customer’s requirement. |
Design & Program Softwares | CAD, CAM, CAE, Pro-E, Solid works…etc. |
Mold building lead time | 30~50 days after mold 3D approved, parts measurement report (upon required). |
Annual production | 300-400 sets of mold |
KYE has a team of professional engineer for the product design with full design experience and skill.The desgined products have received big favor from our customers. KYE team is at your service offering professional expertise, flexibility and accuracy in assumed deadlines.
This are the objective to arrive together with success to the target.Welcome your visit!
Our Advantage
1. Thorough project management system
KYE has thorough project management system from sales team to engineer and worker team.
2. Injection molding workshop
KYE has around 40-50 sets of injection machine range from 50T to 600T.
3. Various Service
We offer various service including Automotive parts, Home Appliance, Electronic and Medical parts with one stop service
including product design, mould fabrication and second processing,such as Spray painting,Printing, Chrome, Engrave and assembling,etc.
4. Professional Engineer team
KYE has 6-8 engineers with 10 year of full expereience, their professional skill can offer you the best solution for the project and help you manage the project in the best effective way.
5. Owned mold making workshop
KYE has owned mold workshop with 2000 squre meteres in house to make sure the high quality and lead time.
FAQ
Q1: Why choose your company?
A: We have a professional mould department and management process is very strict.Our company located in Chang`an who is the mold manfacture center with mature mold manfacture supplier chain and convenient traffic to HK and oversea, we are set up with advanced machines, each process is operated as international standard.
Q2:which better service will you supply for me?
A: (1) you only state your idea or originality, our R&D team can design a satisfactory solution and make 3D drawing.
(2)the first sample will be given out in 10-15days after getting your drawing.
Q3: Which material will your factory use to make a mold?
A. Our regular material has NAK80, S136, LKM, DAIDO, HASCO, DME
Q4. What's your delivery time for molds and plastic injection products?
A. Our delivery time for mold: 3-5 weeks as mold structure complexity.
We can work out total cost of the project and the cost per piece.
If you are saling some products now, we can help you to develop better products idea and manufacturing it with the best possible solution supply chain in China, including product packing and printing supply. Looking for the inquiry from you.
Contact Person: Mr. jeff
Tel: 0086 139 2681 9972
Fax: 86-769-8162-3892
DME Standard S50C LKM 718H Custom Injection Mold Maker
V0 PC Fire Protection Cold Runner OEM DMEElectronic injection Mould
500000 Shots 65A TPE Resin DME HASCO Insert Mould